WDS-800 Full Automatic Optical Alignment Apparatus BGA Repair Robot

Other Videos
August 29, 2025
Category Connection: Semi Automatic BGA Rework Station
Brief: Discover the WDS-800 Full Automatic Optical Alignment Apparatus BGA Repair Robot, designed for precision BGA repair with advanced features like multi-language interface, automatic feeding, and high-definition CCD alignment. Perfect for PCB repairs with max size W650*D610mm and placement precision of ±0.01mm.
Related Product Features:
  • Multi-language menu interface for easy operation.
  • Automatic feeding device enhances efficiency.
  • X/Y axis controlled by joystick for fast and precise alignment.
  • Imported high-definition CCD (2 million pixels) optical alignment system.
  • High precision temperature control system with accuracy up to ±1 degree.
  • Vacuum adsorption and preheating platform for safe PCB handling.
  • Integrated hot air head and mounting head for automatic welding and disassembly.
  • Bottom preheating with IR5000W for uniform heating.
Faqs:
  • What is the maximum PCB size the WDS-800 can handle?
    The WDS-800 can handle PCBs up to W650*D610mm in size.
  • How precise is the temperature control system?
    The temperature control system is highly precise, with accuracy up to ±1 degree, thanks to the K-type thermocouple closed-loop control.
  • Does the WDS-800 support automatic feeding?
    Yes, the WDS-800 features an automatic feeding device for enhanced efficiency and convenience.
Related Videos

DS3000 Offline X-ray component counting machine

Offline X-ray counter machine
January 09, 2025

S7200 X-ray inspection machine

Offline X-ray inspection machine
January 09, 2025

Wisdomshow factory

Semi automatic BGA rework station
September 01, 2025

WDS800A BGA rework station

Semi automatic BGA rework station
August 23, 2024

DS3200 Online X-ray component counter machine

Online X-ray counter machine
August 26, 2024

WDS620 Semi automatic BGA rework station

Semi automatic BGA rework station
August 23, 2024

Easy operate WDS580 BGA rework station

Manual BGA rework station
August 19, 2024